Stand Wind Tunnel TA

 

Function: Vertical Aerodynamic Simulator with a closed aerodynamic contour, conducting trainings of all levels of athletes, training and show programs in comfortable conditions at any time of the year and with minimal energy costs. 

Benefits Stand Wind Tunnel TA:

  • low operating costs;
  • noiselessness;
  • high quality flow;
  • the possibility of rapid and accurate control of flow parameters;
  • the possibility of year-round and round-the-clock operation;
  • comfortable training conditions in all weather conditions;
  • comfortable conditions for spectators and waiting athletes in all weather conditions;
  • the possibility of placing the infrastructure (changing rooms, toilets, cafes, shops)

 

Stand Wind Tunnel TA TORNADO PRO

TA-2,5D (diesel)

Stand Wind Tunnel

Read more

 

TA-2,5E (electric)

Stand Wind Tunnel

Read more

 

TA-3,0

Stand Wind Tunnel

Read more

 

TA-4,3

Stand Wind Tunnel

Read more

 

Stand Wind Tunnel TA-2,5D (diesel)

 

Description of installation TA-2,5D

Wind TunnelDescription of installation TA-2,5D

Basic kit.

Included:

  • Fully functional mobile unit complete with control system, fencing and ramps.
  • Working area with door drive, LED lighting and system for transportation and storage.
  • Remote control.
  • Set of operational documentation.
  • ZiP
  • Technical staff training.

You can request additional information in any way convenient for you - Contact us

Specifications of TA-2,5D

 

 TA-2,5D (diesel engine) 
 Diameter of the working chamber  2.5  Meter  8.2  ft
 Height of the working chamber  8  Meter  26.2  ft
 Flow rate  80  Meter/sec  288  Km/h
 Hourly average fuel consumption  50  liters/hour  11  gal/hr
 Fuel tank capacity  4000  liters  4  m3
 Product weight  45000  kg  45  t

 

You can request additional information in any way convenient for you - Contact us

Dimensions and mass TA-2,5D

01.jpg 02.jpg size_25.jpg

Photos of existing installations TA-2,5D

01.jpg 02.jpg 03.jpg

04.jpg 05.jpg 06.jpg

07.jpg 08.jpg 09.jpg

10.jpg 11.jpg 12.jpg

   

Stand Wind Tunnel TA-2,5E (electric)

 

Description of installation TA-2,5E

Wind Tunnel

Description of installation TA-2.5E

Basic kit.

Included:

  • Fully functional mobile unit complete with control system, fencing and ramps.
  • Working area with door drive, LED lighting and system for transportation and storage.
  • Remote control.
  • Set of operational documentation.
  • Zip
  • Technical staff training.

You can request additional information in any way convenient for you - Contact us

Specifications of TA-2,5E

 

 TA-2,5E (Electrical engine) 
 Diameter of the working chamber  2,5  Meter  8,2  ft
 Height of the working chamber  8  Meter  26,2  ft
 Flow rate  80  Meter/sec  288  Km/h
 Hourly average power consumption  270  kW/h  270  kW/h
 Product weight  45000  kg  45  t

 

You can request additional information in any way convenient for you - Contact us

 

Dimensions and mass TA-2,5E

01.jpg 02.jpg size_25.jpg

Photos of existing installations TA-2,5E

01.jpg 02.jpg 03.jpg

04.jpg 05.jpg 06.jpg

07.jpg 08.jpg 09.jpg

10.jpg 11.jpg

 

Stand Wind Tunnel TA-3,0

 

Description of installation TA-3,0

Wind Tunnel

Description of installation TA-3.0

Basic kit.

Included:

  • Fully functional mobile unit complete with control system, fencing and ramps.
  • Working area with door drive, LED lighting and system for transportation and storage.
  • Remote control.
  • Set of operational documentation.
  • Zip
  • Technical staff training.

You can request additional information in any way convenient for you - Contact us

Specifications of MTA-3,0

 

TA-3,0 
Diameter of the working chamber  3  Meter  10  ft
Height of the working chamber  10  Meter  32,8  ft
Flow rate  80  Meter/sec  288  Km/h
Hourly average power consumption  320  kW/h    
Product weight  80000  kg  80  t

 

You can request additional information in any way convenient for you - Contact us

 

Dimensions and mass TA-3,0

size_30.jpg size_30_1.jpg ta30_mass01.jpg

Photos of existing installations TA-3,0

01.jpg 02.jpg 03.jpg

04.jpg 05.jpg 06.jpg

07.jpg 08.jpg 09.jpg

10.jpg 11.jpg 12.jpg

13.jpg 14.jpg 15.jpg

16.jpg 17.jpg 18.jpg

19.jpg 21.jpg

 

Stand Wind Tunnel TA-4,3

 

Description of installation TA-4,3

Wind Tunnel

Description of installation TA-4.3

The aerodynamic TA 4.3 Wind Tunnel is designed to simulate the effect of the medium on the bodies moving in it and allows you to simulate a free fall during a parachute jump. The simulator is designed for training and training paratroopers and military athletes (with the aim of acquiring practical and theoretical skills in body control in the air flow), for testing equipment, equipment and equipment for athletes, and is also used for entertainment purposes. The simulator will be applied in the next stages of training.:

  • practicing the initial skills of behavior in the air flow;
  • learning the basic elements of a jump;
  • confirmation of skills after long breaks in jumps;
  • training;
  • retraining to other types of parachute equipment.

New development of the company TORNADO PRO!
You can be the first to become the owner of a Stand Wind Tunnel a working chamber diameter of 4.3 meters!
Contact us

Specifications of MTA-4,3

TA-4,3 
Diameter of the working chamber  4,3 Meter    
Height of the working chamber  14 Meter    
Flow rate  80 Meter/sec  288 Km/h
Hourly average power consumption  1420 kW/h    
Product weight  120000 kg  120 t

 

Dimensions and mass TA-4,3

 

New development of the company TORNADO PRO!
You can be the first to become the owner of a Stand Wind Tunnel a working chamber diameter of 4.3 meters!
Contact us

  

Photos of existing installations TA-4,3

New development of the company TORNADO PRO!
You can be the first to become the owner of a Stand Wind Tunnel a working chamber diameter of 4.3 meters!
Contact us

 

 

 

Vertical Wind Tunnel with closed aerodynamic contour

Vertical Wind Tunnel TA is a set of equipment that can be mounted in a separate non-capital structure of LMC (light metal) or inside the building with suitable dimensions for the installation of equipment.

Vertical Aerodynamic Simulator "TA" can be developed according to individual technical requirements of the customer. For construction we use advanced technology. Our “TA” construction principle and the equipment used make it as easy as possible to maintain the service and guarantee reliability. The main components for creating an aerodynamic flow are developed specifically for your requirements.

The power of the aerodynamic flow is easily adjustable. The equipment is very easy to manage. The cost of building a vertical aerodynamic pipe "TA" depends on the requirements that you make to it. As power plants can be used diesel or electric engines.

A constructive feature of our stationary complexes is that they can be used both as separate buildings and integrated into ready-made buildings, shopping or entertainment complexes.

 

The main feature and advantage of our aerodynamic complexes is their availability, cost effectiveness and quick payback.

Just a few years ago, the cost of the cheapest equipment for a stationary aerodynamic complex was a six-digit number. And taking into account the lease or purchase of land, construction and finishing works, the cost of such complexes could reach several million dollars.

Our task was to create an accessible complex that could be used by both athletes and ordinary people. Our engineers were able to complete the task assigned to them as soon as possible. And as a result of their work, at present about twenty Tornado aerodynamic complexes are successfully operating around the world.

The design features of the stationary aerodynamic complexes “Tornado” make it possible to use a variety of options for the exterior of the building.

When developing the design of an aerodynamic complex, the features and traditions of the area where the operation of this complex is planned can be taken into account.

Please note that TA 2.5 can be equipped with both Scania diesel power units and electric power plants of Russian or foreign production.

Our company can perform the project of the aerodynamic stand according to your technical task - leave a request

 

*** This offer is not a commercial offer. Prices are subject to change and specified at the conclusion of the contract.